Busan urban rail construction headquarter is built
Line 1 is built with distinct four steps
lst step part construction was begun and opened(Nopodong~Beomnaegol 16.2㎞)
2nd step part construction was begun and opened(Beomnaegol~Jungangdong 5.4㎞)
3rd step part construction was begun and opened(Jungangdong~Seodaesindong 4.5㎞)
4th step part construction was begun and opened(Seodaesindong~Sinpyeong 6.4㎞)
※34 stations of 32.5km from Nopodong to Sinpyeong were opened and in operation
Busan transportation corporation rules were made and announced
Busan transportation corporation was founded
Line 2 first step part construction was begun(Yangsan Hopo~Seomyeon 21.7㎞)
Line 2 2nd step part construction was begun (Seomyeon~Jangsan 16.3㎞)
the basic plans for Line 3 construction and operation was decided
Line 3 construction for the part from Daejeo ~ Suyeong was begun (18.3km)
Line 2 1st step part was opened (Yangsan Hopo~Seomyeon 21.7㎞)
Line 2 2nd step part from Seomyeon to Geumnyeonsan was opened(Seomyeon~Geumnyeonsan 7.7㎞)
Line 2 expanded part construction was begun (Yangsan Hopo~Jungbu 8㎞)
Line 2 Gwangan station was opened
Line 2 from Gwangan to Jangsan was opened
The construction of Line 4 from Minam to Anpyeong was begun(12.7Km)
The rule of Busan transportation corporation was announced to be cancelled
Line 3 from Suyeong to Daejeo was opened(18.3km)
the foundation of Busan transportation corporation
the expanded section of Line 2(Hopo~Yangsan) was opened(8Km)
Line 2 Pusan national university Yangsan campus station was opened
Line 4 from Minam to Anpyeong was opened
the cultural management of urban rail was announced
Incheon international airport shuttle train O&M service provision
Peru Lima metro line 2 construction supervision service provision
new company motto was announced
Ground-Breaking Ceremony for Sasang-Hadan Line
Integrity BI was announced
Line No. 1 was extended, and Dadae section (7.98 km) was opened
Groundbreaking ceremony for the Yangsan Line (Nopo–Bukjeong, 11.43 km)
Designated as a railway vehicle maintenance training institution
Launch of subsidiary Busan Urban Railway Operation Service Co., Ltd.
Implementation of QR ticketing system
Launch of mobile tickets exclusively for Busan Urban Railway
Achieved Grade 1 in the 2023 Comprehensive Integrity Assessment of Public Institutions
First in Korea, one Line 1 trainset designated a Busan Metropolitan City Registered Cultural Heritage
Designated as a railway traffic control training institution
Achieved a record-high 19.0% urban railway share of Busan public transport ridership
Ranked No. 1 in Railway Safety Management Level Assessment
Opened Metro Lounge Gwangan